Arknights Wiki
Bolívar
Under-Construction Beachside
Contingency Contract
Lady Candela has carved out a corner of Dossoles's artificial beach to allow the newly-arriving Durin architects to show off their talents, but when these "geniuses" get sloshed with the local workers and start making a scene, someone needs to teach them a lesson.
<Deep Water Zone> Unable to deploy on these tiles. Enemies on these tiles have reduced ASPD and Movement Speed, and continually lose HP
<Custom Floating Platform> Can be deployed on Deep Water Zones, thereafter any unit can be deployed on that tile. The platform is destroyed when the deployed unit retreats.
Appearances
  1. C.C. Fake Waves (Permanent Site)
  2. C.C. Basepoint (Rotating Site #6)

Information

Unit Limit Initial DP Life Points Enemies
9 10 3 47
Deployable devices Custom Floating Platform ×4
Terrain properties Enemies on a Deep Water Zone have their ASPD and speed reduced by 60%, and takes 40 Pure damage every second.
Additional information
There are pre-deployed Custom Floating Platforms on C5, C8, C10, D5, E5, F5, G5, G9, G10, and G11.

Enemies

Normal Diver ×2, Delinquent ×6, Delinquent Boss ×4, Sandcastle Builder ×5, Ergate ×7, Ergate Leader ×11
Elite Dockworker ×4, Dockworker Leader ×2, Full Metal Surfing Instructor ×3, Fully-Enclosed Beach Buggy ×3

Guide